64 PC
OPTUM ASSESSMENT COMPLETED: JC: Sent to Intake, Chapman, Megan, and Mary-Kate: OPTUM ASSESSMENT: Helena Thomas assessment was completed on the scheduled date of : 07/30/2024 No tier level available.
MMIS not updated previous MMIS 11-MLTA Tier 0 DOB 10/15/1933
OPTUM ASSESSMENT EMAIL: JC SENT To Chapman, Intake, Megan, and Mary-Kate: Helena Thomas OPTUM assessment is scheduled for: 07/30/2024 between: 1pm-3:30pm
OPTUM ASSESSMENT SCHEDULED: JC s/w CL. Made a 3-way call to OPTUM: spoke to Rep: Jayleen Assessment is scheduled for 07/30/2024 1pm-3:30pm.
Drive up with Chloee to get signed CSA and E-sig for 618.
No answer, trying to see if tomorrow is good time to get CSA and E sig
Revver 618 sent.
Added to WellSky.
Call from Josie with Helena. FR MMIS: 11-MLTA (1868914001) non Passe. Tier 0 DAAS 2/02/24. Ready for 618, sent to Mary Kate.